Merebank Sai Centre Ashram Building
2012 - 2013
OPTION 1: OFFER BY DHANPAL NAIDOO
VIEW TO THE MAZZANINE FLOOR FROM THE ADJOURNING OFFICE
TOP OPEN AREA TO BE SLABBED
1st Site Inspection
Tuesday 4th Dec 2012 - 3.30pm
BRIEFING BY DHANPAL NAIDOO
SITE BEFORE COMMENCING
BREAKING UP ON SIDE WALLS
BREAKING UP THE WALLS IN THE BASEMENT
SECTION OF THE HALL
WALLS ARE DEMOLISHED
OUTSIDE VIEW OF THE ASHRAM
INTERIOR WALLS BRICKED UP &
THE VACANT SECTION TO BE SLABBED
BUILDING OF TOILETS
Digging of Trench
(Pipeline for Toilets)
Pipelines Fitted
↑
Pipelines
Being Laid
Toilets Built
←
Males
Females →
Door Frame
↓
Kitchen
↓